
MHC
Two experienced Concrete Finishers are required for work at the Lackenby Substation, a National Grid site, on the 22nd and 23rd of May. The role involves performing power float finishing on high-precision concrete surfaces, with a strict surface tolerance of 3mm. Attention to detail and a high level of skill are essential for this position.
Concrete Finishers (x2) Lackenby Substation (National Grid Site)
Substation
22nd & Thursday 23rd May
Role Overview
We are looking for two experiencedConcrete Finishersto perform power float finishing on high-precision concrete surfaces at Lackenby Substation. This work requires achieving a surface tolerance of 3mm, so attention to detail and skill are essential. Valiā¦
JBLK1_UKTJ
Source ⇲
joblookup.com